During the installation
The distance between the supplemental beam and the main beam was over 11 feet. Added with the weight of the insulation and water piping as seen through this picture, something had to be done before the weight became too much for the beams to support. Smartjack was the SMART option.
During the installation
A completed hole ready for the Smartjack installation that was dug, filled, and leveled.
During the installation
Phillip and his crew installing a support beam, which the Smartjack will be attached to.
During the installation
An up close look at the Smartjacks attached to the support beams.
During the installation
Digging the holes.
During the installation
Regardless of whether the soil is made of its own rocks or gravel, Redeemers brings in our own rock. Local river rocks have round edges, which allows for give underneath the jacks, something we try to avoid, while the rock the Redeemers brings in is gravel with sharp edges, which allows for no give.
During the installation
Digging the hole.
During the installation
The Smartjack being attached to the support beam.