Before the injection
A team had previous gone to the site to try and begin work, as seen through the hole that had been dug. The concrete slab under the air conditioning unit is catching all of the runoff condensation, which instead of running down to the gravel, the owner would prefer to have it run back towards the building.
Before the injection
The owner going over just exactly how he wants the Polylevel injected, along with his expected outcome, with Dalton and Shane.
Before the injection
The front of the concrete slab, into which the Polylevel is to be injected
Before the injection
The side of the concrete slab where the excess condensation and run off from the air conditioning unit accumulates.
Before the injection
The side of the concrete slab where the excess condensation and run off from the air conditioning unit accumulates.
A tricky job-site
The team had to park in a near by area, run the hoses from the parked truck over the fence line, then jump the fence line and hike a hill in order to bring over necessary tools. Yet the Redeemers still got the job done!
A tricky job-site
Dalton is seen pulling the hose up the hill from the fence line.
Before the injection
The hose finally made it up the hill!
The injection
Dalton drilling the necessary holes through the metal and concrete slab.
Teamwork makes the dream work!
In order to allow Shane to get the best angle with the drill, Dalton aligned his boot with the drill bit. This particular job was increasingly more difficult due to the large and awkwardly shaped air conditioning unit on the top of the slab of concrete.
The injection
Shane drilling the necessary holes through the metal and concrete.
The injection
All of the holes have been drilled and are awaiting the Polylevel foam.
The injection
Shane drilling the necessary holes for the Polylevel foam to be injected into.